THD002 Powder Spraying Machine 220V / 110V Manual Powder Paint Equipment
Product Details:
Place of Origin: | Chongqing, China |
Brand Name: | N/M |
Model Number: | THD002 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 |
---|---|
Price: | Negotiable |
Packaging Details: | standard carton |
Delivery Time: | 3-7 workdays |
Payment Terms: | T/T, L/C, Western Union, PayPal, Credit card |
Detail Information |
|||
Type: | Electrostatic Powder Coating Machine | Usage: | Powder Coating On Substrate Surface |
---|---|---|---|
Power: | 50W | Voltage: | 220V/110V |
Dimension(L*W*H): | 64*46*98cm | Operation Way: | Manual Powder Coating Equipment |
Core Components: | Engine, Pump | Weight: | 32KG |
High Light: | 220V Powder Spraying Machine,THD002 Powder Spraying Machine,110V Powder Paint Equipment |
Product Description
High Quality Powder Spraying Machine Coating Paint Oven Booth
Our Company
With more than 10 years experience, ChongQing HaoDong Technology Co.,Ltd, specialized in developing and producing infrared catalytic ceramic gas burner&heater, and achieved very good energy saving
Now we have intensified our efforts to develop and introduce a series of new products, including electrostatic overhead conveyor chain, spray machines and fans etc, we would like to be your one-stop shop of powder
coating and spraying equipment.
Product Description
The spray equipment uses an automatic current feedback circuit and adds a pulse control circuit. The gas control part adopts two-stage gas source filtration, voltage regulation and air pressure adjustment, all designed as preset adjustments. The powder output is more uniform, the atomization is better, and the dead angle is much better.
The main technology adopts advanced technologies from Germany and Switzerland, and combines China's national conditions to improve and innovate in reliability. Use the digital panel forwarding key. It can change the pulse and normal function, and voltage current display function. With a very high powdering rate and the best coating quality, it is the advanced spraying equipment in China.
Powder coating machine front and rear panel schematic
1. powder pressure display 2. atomization pressure display 3. powder regulator
4. atomization regulator 5. Voltage display 6. current display
7. potentionmeter 8. power switch
9. Electric socket 10. Spray gun joint 11. Ground
12. Atomization air 13. Concentration air 14,Main air intake
Specification
Input Voltage | AC220V±10% |
Frequency | 50Hz |
Input Power | 34W |
Output Voltage | 12VDC |
Out Current | 1A |
Maximum output voltage | 0-100KV |
Water vapor content of compressed air | 1.3g/m³ |
Oil vapor content of compressed air | <0.01g/m³ |
Input Voltage | 12V |
Input current | 1A |
Output Voltage | 0-80KV |
Maximum powder injection | 500g/min |
Polarity | negative (-) |
Gun weight | 500g |
The safety rules
1. You must read the instructions carefully before use.
2. The operator must wear appropriate labor protection supplies before operation.
3. The spray equipment and the workpiece to be sprayed must be well grounded in the work site.
4. Gloves are not allowed when the worker is in contact with the spray gun.
5. No smoking is allowed in the workplace, and fire is prohibited.
6. After work finished, turn off the power before cleaning the gun and replacing parts.
Use direction
1. Check that all parts of the equipment are installed according to the assembly drawing and connected correctly.
2. Turn on the power, the power indicator light is on, input compressed air, adjust the air supply regulating valve on the rack to make it to be 6BAR.
3. Add the powder to the powder supply bucket for about 2/3 of the best, then adjust the fluidizer regulating valve to make the powder in the barrel flip, but it should not be too heavy to avoid the powder from rushing out of the barrel, after finishing adjustment lock the regulating valve, close the barrel cover and buckle, and connect the exhaust hose to the spray chamber.
4. Hold the spray gun towards the spray booth, press the trigger, adjust the high pressure rotary set, and select the high pressure according to the product (usually 50-60KV for the first spray, 20-30KV for the second or multiple spray ).
5. Adjust the powder air pressure reducing valve. The timing air head indicator is about 2BAR, and the dilution air meter head about 0.1BAR. At this time, the workpiece can be sprayed.
Package